MC2010MN Installation Video

Video is 3:15 minutes long  - NO AUDIO AVAILABLE

Video will show the following sequences:

  • Cleaning and laying out MC-2010MN between 2 rows of rebar
  • Applying adhesive to concrete surface and MC-2010MN
  • Attaching on wet concrete with screws or nails
  • Applying Adeka P-201 in areas of "loose" contact with concrete used on rough concrete
  • Shows side-by-side lap procedure
  • Example of MC-2010MN on "stair step" condition
  • Job Completion

CHECK WITH YOUR LOCAL REPRESENTATIVE for curing times and detailed installation instructions.

 
 
 

© Copyright 2022 OCM, Inc.

Website by XBX Effective Web Solutions